Current Projects

Griswold High School, CT

At Griswold High School in Connecticut, Track and Field Installers poured 522 linear feet of drain around the radius of the new running track. TFI was also responsible for forming and pouring 1172 linear feet of turf termination curb around the perimeter of the synthetic turf. For the athletic events on site, TFI formed and poured two concrete sand pits and poured the football goal post foundations. We will return at a later date to complete the goal post assembly and install the pole vault box.

Norton Field, Ayer Shirley HS, MA

Pictured below is Norton Field at the Ayer Shirley High School in Massachusetts where TFI is currently installing ACO SPORT system 4020 trench and 2000 slot drain systems.

Goffstown High School, New Hampshire

At Goffstown High School, Track and Field Installers formed and poured approximately 1,240 LF of concrete curb along with pouring foundations for the goal posts. Track and Field installers will return when this project nears completion to assemble the goal posts.